26 February, 2025

Planting on the left bank of the Ebro in Castejón and Valtierra, phase 1 of the environmental restoration of El Señorío

Gestión Ambiental de Navarra, through the technical management of the Government of Navarra, is working on the creation of wooded areas to recover a degraded space in front of the meander that will be recovered as a fluvial space.
3 February, 2025

Nature makes its way: meander of La Roza, Alfaro, one year later

The new video of the LIFE Ebro Resilience P1 Project shows the space recovered for the river, analyzes with the technicians of the CHE and the Government of La Rioja the interventions carried out and shows the effect of these actions during the last floods.
23 January, 2025

Tools for the adaptation of the riparian population: tips for self-protection against floods

Responding to the request of the people participating in the different groups of the LIFE Ebro Resilience P1 Project, we compiled information from different official sources of civil protection in order to face the flood phenomenon.
28 November, 2024

The second phase of the adaptation of the irrigation infrastructure in Fuentes de Ebro (Zaragoza) begins.

The work on the new underground pipeline, far from the bed of the Huerta del Ebro Irrigation Community (Zaragoza), is focused on the last kilometer of the infrastructure and is being carried out on dates that do not interfere with the irrigation campaign.