Actions carried out

EBRO RESILIENCE: River restoration and habitat improvement. Section Alcalá de Ebro – Remolinos (Zaragoza).

Video of the actions that the Aragonese Water Institute has carried out in the Alcalá de Ebro – Remolinos section, within the framework of the Ebro Resilience Strategy.river restoration and habitat improvement in the Ebro river section.

EBRO RESILIENCE: River restoration and habitat improvement. Torres de Berrellén – Sobradiel (Zaragoza) section.

Video of the actions that the Aragonese Water Institute has carried out in Torres de Berrellén and Sobradiel, within the framework of the Ebro Resilience Strategy.river restoration and habitat improvement in the Ebro river section.

EBRO RESILIENCE: Reconnecting the Ebro River—Fish Ladder at the Pina Weir

Designed to accommodate the Ebro River’s flow rates—both during low-water and high-water periods— this fish ladder at the Pina weir (between the municipalities of Burgo de Ebro and Nuez de Ebro, in Zaragoza) ensures the continuity of a roughly 60-km stretch of the river.