{"id":16127,"date":"2026-03-20T14:53:31","date_gmt":"2026-03-20T13:53:31","guid":{"rendered":"https:\/\/www.ebroresilience.com\/municipalities-and-life-ebro-resilience-p1-check-the-actions-of-the-osera-fuentes-section-in-the-field\/"},"modified":"2026-03-24T14:32:49","modified_gmt":"2026-03-24T13:32:49","slug":"municipalities-and-life-ebro-resilience-p1-check-the-actions-of-the-osera-fuentes-section-in-the-field","status":"publish","type":"post","link":"https:\/\/www.ebroresilience.com\/en\/municipalities-and-life-ebro-resilience-p1-check-the-actions-of-the-osera-fuentes-section-in-the-field\/","title":{"rendered":"Municipalities and LIFE Ebro Resilience P1: checking on the ground the adaptation actions in the Osera-Fuentes section."},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"16127\" class=\"elementor elementor-16127 elementor-16110\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-a155f6b elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"a155f6b\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-8f21a06\" data-id=\"8f21a06\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-427e984 elementor-widget__width-initial elementor-widget elementor-widget-text-editor\" data-id=\"427e984\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The <strong>Forum of Local Authorities<\/strong> of the LIFE Ebro Resilience P1 Project has gathered again, this March 20, municipal representatives in a day focused on the technical exchange and the field visit to the section between Osera de Ebro and Fuentes de Ebro (Zaragoza).<\/p><p>This activity of the Local Entities Forum, one of the experiences for the strengthening of social capacities launched by the LIFE Ebro Resilience P1 Project, was attended by representatives and municipal technicians from Fuentes de Ebro and Quinto (Zaragoza), as well as by the Irrigation Community of the Ebro Orchard and technicians of the Project.  <\/p><p>A space to continue informing, educating and reporting the progress of the work to the municipalities, a crucial part of these actions. But also, a day to value the common effort of the riparians, farmers, landowners, municipal entities, the Administrations that have worked in a coordinated manner and the technicians to implement the actions of adaptation to the floods that are already showing their benefits, as was seen in the flood of last February. <\/p><p>On behalf of the partners, attended, among others, the director of the Aragonese Water Institute, Luis Esta\u00fan, from the Ebro Hydrographic Confederation, the technical coordinator of Ebro Resilience, David Gargantilla and the person responsible for the works of this section, Tatiana Garza, and from the TRAGSA Group, the coordinator of the LIFE Ebro Resilience P1 Project, Eduardo Murillo (TRAGSATEC) and the coordinator of Participation and Social Capacity Building of the Project, Alba Ballester.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-909060a elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"909060a\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-080ace0\" data-id=\"080ace0\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-9f3c24c elementor-widget elementor-widget-image\" data-id=\"9f3c24c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"768\" height=\"432\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320102717-768x432.jpg\" class=\"attachment-medium_large size-medium_large wp-image-16128\" alt=\"20260320 Local Entities Forum visit to the Osera - Fuentes (Zaragoza) section. panel at the water inlet to the river branch that connects the river through the Aguilar meander.\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320102717-768x432.jpg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320102717-300x169.jpg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320102717-1024x576.jpg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320102717-1536x864.jpg 1536w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320102717-2048x1153.jpg 2048w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320102717-133x75.jpg 133w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320102717-480x270.jpg 480w\" sizes=\"(max-width:767px) 480px, (max-width:768px) 100vw, 768px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Panel at the entrance to the new branch of the river that connects the Ebro across part of the Meandro de Aguilar.<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-4781f50 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"4781f50\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-96c74da\" data-id=\"96c74da\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-8efa09a elementor-widget elementor-widget-spacer\" data-id=\"8efa09a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-caa64b6 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"caa64b6\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-114464b\" data-id=\"114464b\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-721e787 elementor-widget elementor-widget-text-editor\" data-id=\"721e787\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>A growing forum: participation, doubts resolved and coordination between administrations<\/strong><\/p><p>The Forum has held previous sessions in Alfaro (La Rioja) and Quinto (Zaragoza), where municipal technicians and officials from the Ebro Hydrographic Confederation and regional governments addressed practical issues such as:<\/p><ul><li>What actions can be carried out in the public water domain.<\/li><li>Which administrations are involved in each type of work or maintenance.<\/li><li>What procedures and authorizations are required.<\/li><li>What lines of financing are available for adaptation measures.<\/li><\/ul><p>The field visit has made it possible to continue this work, bringing the debate to the territory itself and providing the municipalities with first-hand knowledge of the actions implemented and underway.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-d3179d9 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"d3179d9\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-55cc40b\" data-id=\"55cc40b\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-a94fab8 elementor-widget elementor-widget-image\" data-id=\"a94fab8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"768\" height=\"432\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320112337-768x432.jpg\" class=\"attachment-medium_large size-medium_large wp-image-16129\" alt=\"20260320 Local Entities Forum visit to the Osera - Fuentes (Zaragoza) section. panel at the water inlet to the river branch that connects the river crossing part of the Aguilar meander.\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320112337-768x432.jpg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320112337-300x169.jpg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320112337-1024x576.jpg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320112337-1536x864.jpg 1536w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320112337-2048x1153.jpg 2048w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320112337-133x75.jpg 133w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320112337-480x270.jpg 480w\" sizes=\"(max-width:767px) 480px, (max-width:768px) 100vw, 768px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Tatiana Garza (Confederaci\u00f3n Hidrogr\u00e1fica del Ebro) explains the performance during the visit.<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-8ec961e elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"8ec961e\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-532af96\" data-id=\"532af96\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-537d6a5 elementor-widget elementor-widget-spacer\" data-id=\"537d6a5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-87b571d elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"87b571d\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-b99bed2\" data-id=\"b99bed2\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-15ba2e7 elementor-widget elementor-widget-text-editor\" data-id=\"15ba2e7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Field visit to the Osera-Fuentes section: seeing on the ground what is already changing<\/strong><\/p><p>The participants toured several points along the stretch where the project has recovered space for the river and initiated environmental restoration processes. The day served to explain <strong>how these actions contribute to reducing damage in future floods<\/strong>, improving river dynamics and favoring biodiversity. <\/p><p>Among the interventions already carried out in this section, the recovery of <strong>23 hectares of floodplain<\/strong> through the relocation of defenses in the Mejana del Conde and the Meandro de Aguilar, where an environmental restoration intervention is already planned.<\/p><p>These actions, already known by the municipalities, have been reviewed today from a practical perspective, analyzing their operation, their integration in the territory and the lessons learned.<\/p><p>The day also provided an opportunity to review the status of <strong>Phase 2<\/strong>, which provides for the creation of <strong>14 Lateral Flow Buffer Zones (LFBZ)<\/strong> along 11.3 km. These temporary flood cells will make it possible to reduce the energy of the water in flood episodes and reduce damage to farms and infrastructures. <\/p><p>The municipalities have been able to raise doubts and provide feedback on the design and implementation of these measures, reinforcing the shared vision that characterizes the project.<\/p><p>LIFE Ebro Resilience P1 continues to work with a participatory approach and a focus on social capacity building.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-bbde3b2 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"bbde3b2\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-33 elementor-top-column elementor-element elementor-element-099f9f9\" data-id=\"099f9f9\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-d9a9cc2 elementor-widget elementor-widget-image\" data-id=\"d9a9cc2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320104512-1024x576.jpg\" class=\"attachment-large size-large wp-image-16130\" alt=\"\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320104512-1024x576.jpg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320104512-300x169.jpg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320104512-768x432.jpg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320104512-1536x864.jpg 1536w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320104512-2048x1153.jpg 2048w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320104512-133x75.jpg 133w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320104512-480x270.jpg 480w\" sizes=\"(max-width:767px) 480px, (max-width:1024px) 100vw, 1024px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Connection of the Ebro river with the new branch that crosses part of the Meandro de Aguilar, a new waterway during floods<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<div class=\"elementor-column elementor-col-33 elementor-top-column elementor-element elementor-element-ee58889\" data-id=\"ee58889\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-a2df8b8 elementor-widget elementor-widget-image\" data-id=\"a2df8b8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320113442-1024x576.jpg\" class=\"attachment-large size-large wp-image-16131\" alt=\"Visit to the irrigation return pipes in the new wetland of the meander of Aguilar.\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320113442-1024x576.jpg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320113442-300x169.jpg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320113442-768x432.jpg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320113442-1536x864.jpg 1536w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320113442-2048x1153.jpg 2048w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320113442-133x75.jpg 133w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320113442-480x270.jpg 480w\" sizes=\"(max-width:767px) 480px, (max-width:1024px) 100vw, 1024px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<div class=\"elementor-column elementor-col-33 elementor-top-column elementor-element elementor-element-a55d12f\" data-id=\"a55d12f\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-115daec elementor-widget elementor-widget-image\" data-id=\"115daec\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320111338-1024x576.jpg\" class=\"attachment-large size-large wp-image-16132\" alt=\"New recessed mote in the meander of Aguilar (Fuentes de Ebro, Zaragoza).\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320111338-1024x576.jpg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320111338-300x169.jpg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320111338-768x432.jpg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320111338-1536x864.jpg 1536w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320111338-2048x1153.jpg 2048w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320111338-133x75.jpg 133w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2026\/03\/IMG20260320111338-480x270.jpg 480w\" sizes=\"(max-width:767px) 480px, (max-width:1024px) 100vw, 1024px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">New recessed mote in the meander of Aguilar (Fuentes de Ebro, Zaragoza).<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-6a03c15 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"6a03c15\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-40e4c30\" data-id=\"40e4c30\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-aed30d6 elementor-widget elementor-widget-spacer\" data-id=\"aed30d6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-3aabda5 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"3aabda5\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-a09768f\" data-id=\"a09768f\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-60c9c28 elementor-widget elementor-widget-text-editor\" data-id=\"60c9c28\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>LIFE Ebro Resilience P1 Project<\/strong><\/p><p>The LIFE Ebro Resilience P1 Project (LIFE20 ENV\/ES\/00327), approved by the European Commission in the LIFE 2020 call, covers La Rioja, Navarra and Arag\u00f3n, has a duration of six years and a total budget of 13.3 million euros, 55% co-financed by the European Union.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>The Project held a new session of the Local Entities Forum with a field visit to the Osera de Ebro &#8211; Fuentes de Ebro (Zaragoza) section, reinforcing the collaboration with the municipalities and the practical knowledge on flood risk adaptation actions.<\/p>\n","protected":false},"author":5,"featured_media":16133,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ngg_post_thumbnail":0,"footnotes":""},"categories":[377,369],"tags":[378,381],"class_list":["post-16127","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-life-en","category-news","tag-ebro-resilience-en","tag-life-ebro-resilience-p1-en"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-05-29 20:48:20","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts\/16127","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/comments?post=16127"}],"version-history":[{"count":5,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts\/16127\/revisions"}],"predecessor-version":[{"id":16197,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts\/16127\/revisions\/16197"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/media\/16133"}],"wp:attachment":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/media?parent=16127"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/categories?post=16127"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/tags?post=16127"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}