{"id":14929,"date":"2025-09-29T09:00:00","date_gmt":"2025-09-29T07:00:00","guid":{"rendered":"https:\/\/www.ebroresilience.com\/?p=14929"},"modified":"2026-01-16T10:27:04","modified_gmt":"2026-01-16T09:27:04","slug":"the-ebro-recovers-23-hectares-as-a-fluvial-space-and-adds-a-new-wetland-in-the-osera-de-ebro-fuentes-de-ebro-section-zaragoza","status":"publish","type":"post","link":"https:\/\/www.ebroresilience.com\/en\/the-ebro-recovers-23-hectares-as-a-fluvial-space-and-adds-a-new-wetland-in-the-osera-de-ebro-fuentes-de-ebro-section-zaragoza\/","title":{"rendered":"The Ebro recovers 23 hectares as a fluvial space and adds a new wetland in the Osera de Ebro &#8211; Fuentes de Ebro section (Zaragoza)"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"14929\" class=\"elementor elementor-14929 elementor-14918\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-72976f9 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"72976f9\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-53bcb77\" data-id=\"53bcb77\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-849787d elementor-widget elementor-widget-text-editor\" data-id=\"849787d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The Ebro adds <strong>23 hectares<\/strong> to its natural flood plain by solving the narrowing of the river at two points, Mejana del Conde and Meandro de Aguilar in the Osera de Ebro &#8211; Fuentes de Ebro section (Zaragoza).<\/p><p>The setting back of longitudinal protections (motes), moving them away from the river, has been one of the main actions of Phase 1 of the &#8220;Improving resilience to floods in the Ebro&#8221; intervention of the LIFE Ebro Resilience P1 Project, with a budget of 3 million euros, which has been implemented by the Ebro Hydrographic Confederation (CHE), through the public company TRAGSA (both partners of the Project).<\/p><p>It has also meant the <strong>creation of a new wetland in this recovered space<\/strong>, where, in addition, an environmental restoration intervention will be carried out by the Government of Aragon, another example of coordinated actions between public administrations.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-80c386b elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"80c386b\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-bd4cffa\" data-id=\"bd4cffa\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-5492eb9 elementor-widget elementor-widget-image\" data-id=\"5492eb9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"228\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Retranqueo-defensa-en-Meandro-de-Aguilar_-04-09-2025-1024x228.jpg\" class=\"attachment-large size-large wp-image-14901\" alt=\"Retrenchment of defense in Meandro de Aguilar\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Retranqueo-defensa-en-Meandro-de-Aguilar_-04-09-2025-1024x228.jpg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Retranqueo-defensa-en-Meandro-de-Aguilar_-04-09-2025-300x67.jpg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Retranqueo-defensa-en-Meandro-de-Aguilar_-04-09-2025-768x171.jpg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Retranqueo-defensa-en-Meandro-de-Aguilar_-04-09-2025-1536x342.jpg 1536w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Retranqueo-defensa-en-Meandro-de-Aguilar_-04-09-2025-2048x455.jpg 2048w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Retranqueo-defensa-en-Meandro-de-Aguilar_-04-09-2025-150x33.jpg 150w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Retranqueo-defensa-en-Meandro-de-Aguilar_-04-09-2025-480x107.jpg 480w\" sizes=\"(max-width:767px) 480px, (max-width:1024px) 100vw, 1024px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Retrenchment of defense in Meandro de Aguilar<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-a952fa6 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"a952fa6\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-3ed8d5f\" data-id=\"3ed8d5f\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-90f318c elementor-widget elementor-widget-text-editor\" data-id=\"90f318c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>As in all Ebro Resilience interventions, the <strong>participation<\/strong> of the interested sectors, especially in this case that of the farmers, led by the Irrigation Community of the Huerta del Ebro, as well as the <strong>consensus<\/strong> with the City Councils of Osera de Ebro and Fuentes de Ebro, have been crucial for the development of the adaptation proposal <strong>promoted by the LIFE financial instrument of the European Commission.<\/strong><\/p><p>In parallel to this intervention, the execution of PHASE 2 is also progressing, which focuses on one of the reference and pioneering interventions of the LIFE Ebro Resilience P1 Project: the <strong>creation of Lateral Flow Buffer Zones (LFZ) that aim to reduce the risk of flooding in 630 hectares of crops on the right bank of the Ebro. <\/strong> <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-e5d65d7 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"e5d65d7\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-6e88bad\" data-id=\"6e88bad\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-917b4a2 elementor-widget elementor-widget-text-editor\" data-id=\"917b4a2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><a href=\"https:\/\/www.youtube.com\/watch?v=n5BQMrfunGI&amp;t=27s\"><strong>More space for the river  <\/strong><\/a><\/p><p>The works executed during Phase 1 were as follows:<\/p><ul><li><strong>Removal of the dike<\/strong> (1,020 meters) in the <strong>mejana del Conde<\/strong> and construction with the same materials, for a more sustainable intervention, of a new defense further away from the Ebro (998 meters).<\/li><li><strong>Removal of the dike<\/strong> (2,035 meters) in the <strong>Aguilar meander<\/strong> and construction with the same materials, for a more sustainable intervention, of a new defense further away from the Ebro (1,598 meters).<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-87e05a0 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"87e05a0\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-fa65e4b\" data-id=\"fa65e4b\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-3c0bb50 elementor-widget elementor-widget-video\" data-id=\"3c0bb50\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;youtube_url&quot;:&quot;https:\\\/\\\/www.youtube.com\\\/watch?v=n5BQMrfunGI&quot;,&quot;video_type&quot;:&quot;youtube&quot;,&quot;controls&quot;:&quot;yes&quot;}\" data-widget_type=\"video.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-wrapper elementor-open-inline\">\n\t\t\t<div class=\"elementor-video\"><\/div>\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-3cc60d8 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"3cc60d8\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-51594e4\" data-id=\"51594e4\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-bac3317 elementor-widget elementor-widget-text-editor\" data-id=\"bac3317\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li><strong>Removal of invasive species to recover riparian vegetation<\/strong>, mainly 1.3 hectares of common reed, the main invasive exotic species in the area.<\/li><li><strong>Creation of a wetland (1.4 hectares), <\/strong>included in the conditioning of the land to reconnect the river with the forest in the Meandro de Aguilar.<\/li><li><strong>Replacement of affected services<\/strong>: roads affected by traffic, sections of affected irrigation ditch, modification of electric pumping line, relocation of a filtering station, adaptation of a pumping house.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-91c7164 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"91c7164\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-b979948\" data-id=\"b979948\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-9f13751 elementor-widget elementor-widget-text-editor\" data-id=\"9f13751\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Lateral flow buffer zones  <\/strong><\/p><p>Phase 2 includes <strong>the most innovative intervention, the proposal of the ZAFL<\/strong>: the creation of a succession of <strong>14 temporary flood zones that <\/strong>will function as &#8220;water cushions&#8221; during extraordinary floods.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-8a4b3d1 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"8a4b3d1\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-36bc666\" data-id=\"36bc666\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-11404dd elementor-widget elementor-widget-image\" data-id=\"11404dd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"979\" height=\"468\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/05\/zonas-de-amortiguacion-de-flujo-lateral.png\" class=\"attachment-large size-large wp-image-14180\" alt=\"Temporary flooding area in Zaragoza province\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/05\/zonas-de-amortiguacion-de-flujo-lateral.png 979w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/05\/zonas-de-amortiguacion-de-flujo-lateral-300x143.png 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/05\/zonas-de-amortiguacion-de-flujo-lateral-768x367.png 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/05\/zonas-de-amortiguacion-de-flujo-lateral-150x72.png 150w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/05\/zonas-de-amortiguacion-de-flujo-lateral-480x229.png 480w\" sizes=\"(max-width:767px) 480px, (max-width:979px) 100vw, 979px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-23744da elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"23744da\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-c5720b2\" data-id=\"c5720b2\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-cff8ab1 elementor-widget elementor-widget-text-editor\" data-id=\"cff8ab1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>It applies the concept of adaptation and seeks to give the river space when it needs it in order to avoid greater impacts. The ZAFLs <strong>compartmentalize the cultivable area<\/strong>, an <strong>area of action 11.30 km long and 630 hectares<\/strong>, into cells that <strong>will be pre-flooded<\/strong> in a controlled manner during episodes of Ebro flooding. The water thus passes over water and, as it does not impact on rigid elements and surfaces, damage and erosion are reduced.    <\/p><ul><li>They allow faster recovery after a flood by reducing erosion and allowing water to drain away after the event.<\/li><li>Lower costs by reducing damage to land and infrastructure during major flood events.<\/li><\/ul><p>The execution consists of the <strong>creation of<\/strong> water <strong>inlet points<\/strong> through the lowering of the dips (17 lowerings in total); the <strong>conditioning of roads and ditches<\/strong> for the closures of these buffer zones (15 closures in total) and the <strong>reinforcement of the areas where the water will pass through<\/strong> (ditch casing, protection of road slopes and riprap cordons).<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-2adb017 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"2adb017\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-50 elementor-top-column elementor-element elementor-element-fa4afca\" data-id=\"fa4afca\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-640ef60 elementor-widget elementor-widget-image\" data-id=\"640ef60\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1024\" height=\"767\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/07\/OSERA-FUENTES_18-02-2025_ZAFL02-1024x767.jpg\" class=\"attachment-large size-large wp-image-14604\" alt=\"Conditioning of the irrigation network in the future Lateral Flow Buffer Zones.\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/07\/OSERA-FUENTES_18-02-2025_ZAFL02-1024x767.jpg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/07\/OSERA-FUENTES_18-02-2025_ZAFL02-300x225.jpg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/07\/OSERA-FUENTES_18-02-2025_ZAFL02-768x576.jpg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/07\/OSERA-FUENTES_18-02-2025_ZAFL02-1536x1151.jpg 1536w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/07\/OSERA-FUENTES_18-02-2025_ZAFL02-2048x1535.jpg 2048w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/07\/OSERA-FUENTES_18-02-2025_ZAFL02-100x75.jpg 100w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/07\/OSERA-FUENTES_18-02-2025_ZAFL02-960x720.jpg 960w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/07\/OSERA-FUENTES_18-02-2025_ZAFL02-480x360.jpg 480w\" sizes=\"(max-width:767px) 480px, (max-width:1024px) 100vw, 1024px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Conditioning of the irrigation network in the future Lateral Flow Buffer Zones.<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<div class=\"elementor-column elementor-col-50 elementor-top-column elementor-element elementor-element-9f58aa0\" data-id=\"9f58aa0\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-00e2267 elementor-widget elementor-widget-image\" data-id=\"00e2267\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"544\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Conde_Acondionando-camino-y-acequia-CC-en-ZAFL-1-2_-04-09-2025-1024x544.jpg\" class=\"attachment-large size-large wp-image-14925\" alt=\"Ditch and road conditioning for Lateral Flow Buffer Zones.\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Conde_Acondionando-camino-y-acequia-CC-en-ZAFL-1-2_-04-09-2025-1024x544.jpg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Conde_Acondionando-camino-y-acequia-CC-en-ZAFL-1-2_-04-09-2025-300x159.jpg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Conde_Acondionando-camino-y-acequia-CC-en-ZAFL-1-2_-04-09-2025-768x408.jpg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Conde_Acondionando-camino-y-acequia-CC-en-ZAFL-1-2_-04-09-2025-1536x817.jpg 1536w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Conde_Acondionando-camino-y-acequia-CC-en-ZAFL-1-2_-04-09-2025-2048x1089.jpg 2048w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Conde_Acondionando-camino-y-acequia-CC-en-ZAFL-1-2_-04-09-2025-141x75.jpg 141w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2025\/09\/Conde_Acondionando-camino-y-acequia-CC-en-ZAFL-1-2_-04-09-2025-480x255.jpg 480w\" sizes=\"(max-width:767px) 480px, (max-width:1024px) 100vw, 1024px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Ditch and road conditioning for Lateral Flow Buffer Zones.  <\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-ae7a0a1 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"ae7a0a1\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-744bd8d\" data-id=\"744bd8d\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-140b4c4 elementor-widget elementor-widget-text-editor\" data-id=\"140b4c4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>In the commitment to public participation, the deliberative process began in 2021 and intensified at the end of 2022 with the creation of a stable participation group between technicians, municipal representatives and representatives of the Irrigation Community.<\/p><p>In addition, other actions have been carried out such as field visits, guided tours with stakeholders and the general population, a public session on buffer zones and field visits to explain in the field the so-called <strong>lateral flow buffer zones <\/strong>to owners or lessees of plots bordering roads or irrigation infrastructure.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-c4cc21d elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"c4cc21d\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-64e3236\" data-id=\"64e3236\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-2279fb0 elementor-widget elementor-widget-image\" data-id=\"2279fb0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"576\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/05\/participacion-de-Fuentes-de-Ebro-768x576.jpg\" class=\"attachment-medium_large size-medium_large wp-image-11562\" alt=\"\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/05\/participacion-de-Fuentes-de-Ebro-768x576.jpg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/05\/participacion-de-Fuentes-de-Ebro-300x225.jpg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/05\/participacion-de-Fuentes-de-Ebro-1024x768.jpg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/05\/participacion-de-Fuentes-de-Ebro-1536x1152.jpg 1536w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/05\/participacion-de-Fuentes-de-Ebro-2048x1536.jpg 2048w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/05\/participacion-de-Fuentes-de-Ebro-195x146.jpg 195w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/05\/participacion-de-Fuentes-de-Ebro-50x38.jpg 50w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/05\/participacion-de-Fuentes-de-Ebro-100x75.jpg 100w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/05\/participacion-de-Fuentes-de-Ebro-960x720.jpg 960w\" sizes=\"(max-width:767px) 480px, (max-width:768px) 100vw, 768px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-351d115 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"351d115\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-bc9dd3f\" data-id=\"bc9dd3f\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-4893e8f elementor-widget elementor-widget-text-editor\" data-id=\"4893e8f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Together with these two phases, in the Osera &#8211; Fuentes section, another LIFE Ebro Resilience P1 intervention is also being carried out by the Government of Aragon,<strong>  the adaptation of the irrigation system of the Huerta del Ebro Irrigation Community (Fuentes de Ebro). This action, which is already in its second phase of works, consists of the   <\/strong>replacement of an existing irrigation ditch with a new underground pipe further away from the riverbed. This will reduce the impact and the cuts that occurred when the defenses were breached. <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-8ebe721 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"8ebe721\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-9202f72\" data-id=\"9202f72\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-985dad7 elementor-widget elementor-widget-image\" data-id=\"985dad7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"576\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-16-at-09.55.03-768x576.jpeg\" class=\"attachment-medium_large size-medium_large wp-image-9798\" alt=\"Concrete pipe installed in the irrigation system of the Huerta de Ebro Community, in Fuentes de Ebro, Zaragoza.\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-16-at-09.55.03-768x576.jpeg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-16-at-09.55.03-300x225.jpeg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-16-at-09.55.03-1024x768.jpeg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-16-at-09.55.03-1536x1152.jpeg 1536w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-16-at-09.55.03-195x146.jpeg 195w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-16-at-09.55.03-50x38.jpeg 50w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-16-at-09.55.03-100x75.jpeg 100w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-16-at-09.55.03-960x720.jpeg 960w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-16-at-09.55.03.jpeg 2040w\" sizes=\"(max-width:767px) 480px, (max-width:768px) 100vw, 768px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-00283d9 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"00283d9\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-debfac7\" data-id=\"debfac7\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-a1aae71 elementor-widget elementor-widget-text-editor\" data-id=\"a1aae71\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>LIFE Project  <\/strong><\/p><p>The LIFE Ebro Resilience P1 Project (LIFE20 ENV\/ES\/00327), <strong>approved by the European Commission in the LIFE 2020 call<\/strong>, covers three autonomous communities (La Rioja, Navarra and Arag\u00f3n), has a duration of 6 years and a total budget of 13,310,350 \u20ac, with 55% European funding.<\/p><p>This project is also an example of institutional coordination and cooperation in the intervention section, being its partners the Ministry for Ecological Transition and Demographic Challenge (MITECO), through its companies TRAGSA and TRAGSATEC; Ebro Hydrographic Confederation; Government of La Rioja; Government of Navarra, through Orekan &#8211; Environmental Management of Navarra, Government of Aragon and the Aragonese Water Institute.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Through PHASE 1 of the adaptation to flood risk of an agricultural area of the LIFE Ebro Resilience P1 project, which has eliminated the narrowing of the river in the Mejana del Conde and the Meandro de Aguilar.  <\/p>\n","protected":false},"author":5,"featured_media":14903,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ngg_post_thumbnail":0,"footnotes":""},"categories":[377,369],"tags":[378,399,398,381,410],"class_list":["post-14929","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-life-en","category-news","tag-ebro-resilience-en","tag-ebro-springs","tag-flood","tag-life-ebro-resilience-p1-en","tag-osera-de-ebro-en"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-05-07 04:43:06","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts\/14929","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/comments?post=14929"}],"version-history":[{"count":3,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts\/14929\/revisions"}],"predecessor-version":[{"id":15721,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts\/14929\/revisions\/15721"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/media\/14903"}],"wp:attachment":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/media?parent=14929"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/categories?post=14929"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/tags?post=14929"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}