{"id":12595,"date":"2024-11-07T08:00:00","date_gmt":"2024-11-07T07:00:00","guid":{"rendered":"https:\/\/www.ebroresilience.com\/?p=12595"},"modified":"2024-11-07T20:42:00","modified_gmt":"2024-11-07T19:42:00","slug":"start-of-works-to-improve-flood-resilience-in-the-osera-de-ebro-fuentes-de-ebro-section-zaragoza","status":"publish","type":"post","link":"https:\/\/www.ebroresilience.com\/en\/start-of-works-to-improve-flood-resilience-in-the-osera-de-ebro-fuentes-de-ebro-section-zaragoza\/","title":{"rendered":"Start of works to improve flood resilience in the Osera de Ebro &#8211; Fuentes de Ebro section (Zaragoza)"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"12595\" class=\"elementor elementor-12595 elementor-12529\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-cc6a16c elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"cc6a16c\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-fd30491\" data-id=\"fd30491\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-d004fd6 elementor-widget elementor-widget-text-editor\" data-id=\"d004fd6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Important new developments in the LIFE Ebro Resilience P1 project that starts the <strong>adaptation<\/strong> works <strong>to flood risk in agricultural areas in the Osera de Ebro &#8211; Fuentes de Ebro section (Zaragoza).<\/strong> The intervention was selected by the LIFE Program as a pilot proposal as it is a novel proposal that will serve<strong> as a reference for other European basins with similar problems.<\/strong> In total, the overall benefit in the section will be the <strong>adaptation of 350 hectares of farms and the recovery of 20 hectares as a space for the river<\/strong>, reducing narrowing.<\/p>\n<p>The works have started with Phase 1 of the &#8220;Improvement of flood resilience in the Ebro River, as it passes through Osera de Ebro and Fuentes de Ebro, in Zaragoza&#8221;, with a <strong>budget of 3 million euros<\/strong>.<\/p>\n<p>The main action consists of <strong>the recovery of the fluvial space to solve the narrowing of the river at two points, the mejana del Conde and the meander of Aguilar.<\/strong> By eliminating two sections of the existing flood defense dykes and rebuilding them further away from the riverbed, the river will be able to flow in this recovered space without causing flooding.<\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-fbaf133 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"fbaf133\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-432ea9b\" data-id=\"432ea9b\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-48fc9d7 elementor-widget elementor-widget-image\" data-id=\"48fc9d7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/10\/WhatsApp-Image-2024-10-30-at-12.44.35-1024x768.jpeg\" class=\"attachment-large size-large wp-image-12534\" alt=\"Inicio de los trabajos retranqueo de motas en Mejana del Conde. Tramo Osera de Ebro - Fuentes de Ebro\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/10\/WhatsApp-Image-2024-10-30-at-12.44.35-1024x768.jpeg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/10\/WhatsApp-Image-2024-10-30-at-12.44.35-300x225.jpeg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/10\/WhatsApp-Image-2024-10-30-at-12.44.35-768x576.jpeg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/10\/WhatsApp-Image-2024-10-30-at-12.44.35-1536x1152.jpeg 1536w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/10\/WhatsApp-Image-2024-10-30-at-12.44.35-195x146.jpeg 195w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/10\/WhatsApp-Image-2024-10-30-at-12.44.35-50x38.jpeg 50w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/10\/WhatsApp-Image-2024-10-30-at-12.44.35-100x75.jpeg 100w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/10\/WhatsApp-Image-2024-10-30-at-12.44.35-960x720.jpeg 960w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/10\/WhatsApp-Image-2024-10-30-at-12.44.35.jpeg 1600w\" sizes=\"(max-width:767px) 480px, (max-width:1024px) 100vw, 1024px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-e572af9 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"e572af9\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-fc457e1\" data-id=\"fc457e1\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-26ed606 elementor-widget elementor-widget-text-editor\" data-id=\"26ed606\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Specifically, the works are:<\/p>\n<ul>\n<li><strong>Removal of the dike<\/strong> (1,020 meters) in the <strong>mejana del Conde<\/strong> and construction with the same materials, for a more sustainable intervention, of a new defense further away from the Ebro (998 meters). This action requires the removal of an existing fruit tree plantation on part of the land to be recovered. <\/li>\n<li><strong>Removal of the dike<\/strong> (2,035 meters) in the <strong>Aguilar meander<\/strong> and construction with the same materials, for a more sustainable intervention, of a new defense further away from the Ebro (1,598 meters).<\/li>\n<li><strong>Removal of invasive species to restore riparian vegetation<\/strong>, mainly 1.3 hectares of common reed, the main invasive exotic species in the area.<\/li>\n<li><strong>Replacement of affected services<\/strong>: roads affected by traffic, sections of affected irrigation ditch, modification of electric pumping line, relocation of a filtering station, adaptation of a pumping house.<\/li>\n<\/ul>\n<p>Like all the actions of the LIFE Ebro Resilience P1 Project, these works are the result of <strong>administrative coordination and the outcome of a process of social participation<\/strong> with stakeholders in this section.<\/p>\n<p>The interventions described above, which have been agreed with the Town Councils of Fuentes de Ebro and Osera de Ebro and with the Irrigation Community of the Huerta del Ebro (where the intervention lands are located) are executed by TRAGSA (public company partner of the Project), under the direction of <strong>the Hydrographic Confederation of the Ebro<\/strong> and, once concluded, the <strong>Government of Aragon<\/strong> will carry out the <strong>environmental restoration of the recovered lands to enhance the restoration of the area as a riparian undergrowth<\/strong>.<\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-d4340ce elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"d4340ce\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-0177dc6\" data-id=\"0177dc6\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-aa0e8b9 elementor-widget elementor-widget-image\" data-id=\"aa0e8b9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"607\" height=\"365\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/07\/fase-1-Osera-deEbro-Fuentes-de-Ebro.jpg\" class=\"attachment-large size-large wp-image-7938\" alt=\"\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/07\/fase-1-Osera-deEbro-Fuentes-de-Ebro.jpg 607w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/07\/fase-1-Osera-deEbro-Fuentes-de-Ebro-300x180.jpg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/07\/fase-1-Osera-deEbro-Fuentes-de-Ebro-243x146.jpg 243w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/07\/fase-1-Osera-deEbro-Fuentes-de-Ebro-50x30.jpg 50w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/07\/fase-1-Osera-deEbro-Fuentes-de-Ebro-125x75.jpg 125w\" sizes=\"(max-width:767px) 480px, 607px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Location plan of mejana del Conde and meander Aguilar and dikes to be recessed<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-dd08333 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"dd08333\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-774d459\" data-id=\"774d459\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-169f900 elementor-widget elementor-widget-text-editor\" data-id=\"169f900\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Lateral flow buffer zones  <\/strong><\/p>\n<p>Phase 2, which is nearing completion and will start soon, includes <strong>the most innovative intervention, the creation of lateral flow buffer zones.<\/strong><\/p>\n<p>The project defines a succession of temporary flooding areas, 14 in total, which will compartmentalize the arable area in cells that will be divided into  <strong>will be pre-flooded in a controlled manner during flood episodes. This will generate water cushions that will minimize damage to farms and infrastructures, mainly for irrigation. <\/strong><\/p>\n<p>Temporary flood areas have already been tested in other areas of the middle reach, demonstrating their effectiveness in reducing impacts on cultivated land and in protecting infrastructure, and the novel approach is the creation of a chain of such areas, amplifying their positive effect.<\/p>\n<p>Together with these two phases, in the Osera &#8211; Fuentes section, another LIFE Ebro Resilience P1 intervention is also being carried out by the Government of Aragon,<strong>  the adaptation of the irrigation system of the Huerta del Ebro Irrigation Community (Fuentes de Ebro). This action, which is already in its second phase of works, consists of the   <\/strong>replacement of an existing irrigation ditch with a new underground pipe further away from the riverbed. This will reduce the impact and the cuts that occurred when the defenses were breached. <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-92dbd9f elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"92dbd9f\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-47e4ce7\" data-id=\"47e4ce7\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-9e19eb6 elementor-widget elementor-widget-video\" data-id=\"9e19eb6\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;youtube_url&quot;:&quot;https:\\\/\\\/youtu.be\\\/w8AVa-rvPO0&quot;,&quot;video_type&quot;:&quot;youtube&quot;,&quot;controls&quot;:&quot;yes&quot;}\" data-widget_type=\"video.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-wrapper elementor-open-inline\">\n\t\t\t<div class=\"elementor-video\"><\/div>\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-ad5ff0c elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"ad5ff0c\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-f8e60e9\" data-id=\"f8e60e9\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-74e10f7 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"74e10f7\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-6a63167\" data-id=\"6a63167\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-9ac4859 elementor-widget elementor-widget-text-editor\" data-id=\"9ac4859\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Stakeholder participation  <\/strong><\/p>\n<p>The LIFE Ebro Resilience P1 project has public participation as one of its main lines of action and therefore all the interventions of the Osera &#8211; Fuentes section have gone through a process with the interested parties.<\/p>\n<p>The deliberative process started in 2021 and intensified at the end of 2022 with the creation of a stable participation group between technicians, municipal representatives and the Irrigation Community.<\/p>\n<p>In addition, other actions have been carried out such as field visits, guided tours with stakeholders and the general population, a public session on buffer zones and field visits to explain in the field the so-called<strong>lateral flow <\/strong> <strong>buffer zones <\/strong> for owners or lessees of plots bordering roads or irrigation infrastructure.<\/p>\n<p><strong>LIFE Project <\/strong><\/p>\n<p>The LIFE Ebro Resilience P1 Project (LIFE20 ENV\/ES\/00327), <strong>approved by the European Commission in the LIFE 2020 call<\/strong>, covers three autonomous communities (La Rioja, Navarra and Arag\u00f3n), has a duration of 6 years and a total budget of 13,310,350 \u20ac, with 55% European funding.<\/p>\n<p>This project is also an example of institutional coordination and cooperation in the intervention section, its partners being the Ministry for Ecological Transition and Demographic Challenge (MITECO), through its companies TRAGSA and TRAGSATEC; the Ebro Hydrographic Confederation; the Government of La Rioja; the Government of Navarra, through Gesti\u00f3n Ambiental de Navarra, S.A. (GAN-NIK); the Government of Arag\u00f3n and the Aragonese Water Institute.<\/p>\n<p><strong> <\/strong><\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>LIFE Ebro Resilience P1 reaches another milestone with the start of work on Phase 1 of the morphological adaptation and river recovery of the Mejana del Conde and the meander of Aguilar, one of the three interventions planned in Zone 2 of the project, which includes the Aragonese section.  <\/p>\n","protected":false},"author":5,"featured_media":12531,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ngg_post_thumbnail":0,"footnotes":""},"categories":[377,369],"tags":[621,396,399,398,619,381,618,617,410,607,503,483],"class_list":["post-12595","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-life-en","category-news","tag-adaptacion-en","tag-adaptation","tag-ebro-springs","tag-flood","tag-lateral-flow-buffer-zones","tag-life-ebro-resilience-p1-en","tag-meandro-aguilar-en","tag-mejana-del-conde-en","tag-osera-de-ebro-en","tag-restauracion-en","tag-river-area","tag-zaragoza-en"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-05-06 20:09:49","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts\/12595","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/comments?post=12595"}],"version-history":[{"count":5,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts\/12595\/revisions"}],"predecessor-version":[{"id":12603,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts\/12595\/revisions\/12603"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/media\/12531"}],"wp:attachment":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/media?parent=12595"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/categories?post=12595"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/tags?post=12595"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}