{"id":10542,"date":"2024-03-27T10:52:39","date_gmt":"2024-03-27T09:52:39","guid":{"rendered":"https:\/\/www.ebroresilience.com\/drafting-of-construction-projects-for-eleven-sections-of-the-ebro-resilience-strategy\/"},"modified":"2024-04-18T13:32:27","modified_gmt":"2024-04-18T11:32:27","slug":"drafting-of-construction-projects-for-eleven-sections-of-the-ebro-resilience-strategy","status":"publish","type":"post","link":"https:\/\/www.ebroresilience.com\/en\/drafting-of-construction-projects-for-eleven-sections-of-the-ebro-resilience-strategy\/","title":{"rendered":"Drafting of construction projects for eleven sections of the Ebro Resilience Strategy."},"content":{"rendered":"\n<p><\/p>\n\n<h3 class=\"wp-block-heading\"><strong>The Ebro Resilience Strategy launches the bidding process for four consulting contracts for the drafting of the construction projects of sections 3A, 3B, 4, 5, 6, 8, 10, 11, 12B, 15 and 16.<\/strong><\/h3>\n\n<p>The <strong>Ebro Resilience Strategy<\/strong> is developing a series of interventions in the Ebro River consisting of the application of combinations of different measures aimed at improving <strong>flood risk management, morphological recovery of the riverbed and fluvial restoration <\/strong>in different sections of the river.<\/p>\n\n<p>The measures contemplated include the improvement, removal or relocation of existing defenses; creation of relief channels; recovery of lost river branches; establishment of safety perimeters for urban centers; expansion of river space; development of flood areas; recovery of riparian forests and elimination of exotic species, among others.<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"615\" data-id=\"1943\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/12\/tramo-9-torres-de-berrellen-sobradiel-resumen-pagina-13-imagen-0002-1024x615.jpg\" alt=\"Figure 11. Defense dike being overflowed and eroded in its backside (Confederaci&#xF3;n Hidrogr&#xE1;fica del Ebro).\" class=\"wp-image-1943\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/12\/tramo-9-torres-de-berrellen-sobradiel-resumen-pagina-13-imagen-0002-1024x615.jpg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/12\/tramo-9-torres-de-berrellen-sobradiel-resumen-pagina-13-imagen-0002-300x180.jpg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/12\/tramo-9-torres-de-berrellen-sobradiel-resumen-pagina-13-imagen-0002-768x462.jpg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/12\/tramo-9-torres-de-berrellen-sobradiel-resumen-pagina-13-imagen-0002-243x146.jpg 243w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/12\/tramo-9-torres-de-berrellen-sobradiel-resumen-pagina-13-imagen-0002-50x30.jpg 50w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/12\/tramo-9-torres-de-berrellen-sobradiel-resumen-pagina-13-imagen-0002-125x75.jpg 125w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/12\/tramo-9-torres-de-berrellen-sobradiel-resumen-pagina-13-imagen-0002.jpg 1341w\" sizes=\"(max-width:767px) 480px, (max-width:1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"> Defense dike being overflowed and eroded in its backside (Confederaci\u00f3n Hidrogr\u00e1fica del Ebro).<\/figcaption><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"386\" data-id=\"10214\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/03\/cauce-de-alivio-2-R-1024x386.jpg\" alt=\"View of the meander and the relief channel of La Roza, Alfaro, La Rioja\" class=\"wp-image-10214\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/03\/cauce-de-alivio-2-R-1024x386.jpg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/03\/cauce-de-alivio-2-R-300x113.jpg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/03\/cauce-de-alivio-2-R-768x290.jpg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/03\/cauce-de-alivio-2-R-1536x579.jpg 1536w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/03\/cauce-de-alivio-2-R-2048x772.jpg 2048w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/03\/cauce-de-alivio-2-R-260x98.jpg 260w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/03\/cauce-de-alivio-2-R-50x19.jpg 50w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2024\/03\/cauce-de-alivio-2-R-150x57.jpg 150w\" sizes=\"(max-width:767px) 480px, (max-width:1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">View of the meander and the relief channel of La Roza, Alfaro, La Rioja<\/figcaption><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"841\" height=\"1024\" data-id=\"1330\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/06\/exoticas-cana-841x1024.jpg\" alt=\"\" class=\"wp-image-1330\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/06\/exoticas-cana-841x1024.jpg 841w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/06\/exoticas-cana-246x300.jpg 246w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/06\/exoticas-cana-768x935.jpg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/06\/exoticas-cana-120x146.jpg 120w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/06\/exoticas-cana-41x50.jpg 41w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/06\/exoticas-cana-62x75.jpg 62w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/06\/exoticas-cana.jpg 1176w\" sizes=\"(max-width:767px) 480px, (max-width:841px) 100vw, 841px\" \/><figcaption class=\"wp-element-caption\">Elimination of exotic species<\/figcaption><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"5375\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/01\/FUNES-F3_13-01-2022_01-1024x768.jpg\" alt=\"River restoration works on the Arga river in Funes\" class=\"wp-image-5375\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/01\/FUNES-F3_13-01-2022_01-1024x768.jpg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/01\/FUNES-F3_13-01-2022_01-300x225.jpg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/01\/FUNES-F3_13-01-2022_01-768x576.jpg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/01\/FUNES-F3_13-01-2022_01-1536x1152.jpg 1536w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/01\/FUNES-F3_13-01-2022_01-2048x1536.jpg 2048w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/01\/FUNES-F3_13-01-2022_01-195x146.jpg 195w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/01\/FUNES-F3_13-01-2022_01-50x38.jpg 50w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/01\/FUNES-F3_13-01-2022_01-100x75.jpg 100w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2023\/01\/FUNES-F3_13-01-2022_01-960x720.jpg 960w\" sizes=\"(max-width:767px) 480px, (max-width:1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">River restoration works on the Arga river in Funes<\/figcaption><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"644\" data-id=\"1660\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/11\/ed-cde-figura-5-perimetro-seguridad-1024x644.jpg\" alt=\"Figure 5. Caba&#xF1;as de Ebro security perimeter (Ebro Hydrographic Confederation).\" class=\"wp-image-1660\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/11\/ed-cde-figura-5-perimetro-seguridad-1024x644.jpg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/11\/ed-cde-figura-5-perimetro-seguridad-300x189.jpg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/11\/ed-cde-figura-5-perimetro-seguridad-768x483.jpg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/11\/ed-cde-figura-5-perimetro-seguridad-232x146.jpg 232w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/11\/ed-cde-figura-5-perimetro-seguridad-50x31.jpg 50w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/11\/ed-cde-figura-5-perimetro-seguridad-119x75.jpg 119w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2020\/11\/ed-cde-figura-5-perimetro-seguridad.jpg 1265w\" sizes=\"(max-width:767px) 480px, (max-width:1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Caba\u00f1as de Ebro security perimeter (Ebro Hydrographic Confederation).<\/figcaption><\/figure><\/figure>\n\n<p><\/p>\n\n<p>In order to achieve the proposed objectives, the  <strong>Ministry for Ecological Transition and the Demographic Challenge<\/strong>, through its public enterprise  <strong><a href=\"https:\/\/www.tragsa.es\/es\/Paginas\/default.aspx\" target=\"_blank\" rel=\"noreferrer noopener\">TRAGSA<\/a><\/strong>has published the  <strong>bidding<\/strong>  of four consulting contracts for the  <strong>drafting of the construction projects for the  <\/strong><a href=\"https:\/\/www.ebroresilience.com\/en\/detailed-studies\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>sections<\/strong><\/a><strong>  3A, 3B, 4, 5, 6, 6, 8, 10, 11, 12B, 15 and 16.  <\/strong>This procedure is performed  <strong>under the Recovery, Transformation and Resilience Plan (PRTR) financed by the European Union &#8211; NextGeneration (EU)<\/strong>.<\/p>\n\n<p>Those interested in participating in the tender may<strong>submit their bids until 2:00 p.m. on April 18,<\/strong> in the manner indicated in the <a href=\"https:\/\/contrataciondelestado.es\/wps\/portal\/!ut\/p\/b0\/04_Sj9CPykssy0xPLMnMz0vMAfIjU1JTC3Iy87KtUlJLEnNyUuNzMpMzSxKTgQr0w_Wj9KMyU1zLcvQjEz28_XPMjTz8i108LRJ9jAOCgg0NAm1t9Qtycx0BjofB8w!!\/\" target=\"_blank\" rel=\"noreferrer noopener\">announcement<\/a> published in the TRAGSA company&#8217;s contracting profile.<\/p>\n\n<p>The <strong>total budget for the tender is 530,900.81 \u20ac<\/strong> and the projects must be drafted within<strong> 12 months <\/strong>of the award. In order to achieve the planned objectives within the deadline, the tender has been divided into <strong>four lots<\/strong>:<\/p>\n\n<p><strong>Lot 1<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li>Section 8. Ebro in Caba\u00f1as de Ebro<\/li>\n\n\n\n<li>Section 16. Ebro in Villafranca de Ebro and Fuentes de Ebro<\/li>\n\n\n\n<li>Section 12B. Ebro at Pina de Ebro and Quinto<\/li>\n<\/ul>\n\n<p><strong>Lot 2<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li>Section 4. Ebro from Fontellas to Novillas<\/li>\n\n\n\n<li>Section 5. Huecha in Mall\u00e9n, Cortes and Novillas<\/li>\n\n\n\n<li>Section 6. Ebro in Pradilla de Ebro and Boqui\u00f1eni<\/li>\n<\/ul>\n\n<p><strong>Lot 3<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li>Section 10. Ebro in Utebo, Alfocea, Monzalbarba and Zaragoza<\/li>\n\n\n\n<li>Section 11. Ebro in Zaragoza and Pastriz<\/li>\n\n\n\n<li>Section 15. Ebro in Gelsa and La Zaida<\/li>\n<\/ul>\n\n<p><strong>Lot 4<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li>Section 3A. Ebro and Ega in San Adri\u00e1n and Calahorra<\/li>\n\n\n\n<li>Section 3B. Ebro in Calahorra and Azagra<\/li>\n<\/ul>\n\n<p>The mission of the successful bidders will be to <strong>draw up the construction projects that will be used for the execution of the measures contemplated in each of the above-mentioned sections<\/strong>. The management of the contracts will be carried out by the Confederation. <strong>\n  <a href=\"https:\/\/www.chebro.es\/\">Confederation <\/a>\n  <a href=\"https:\/\/www.chebro.es\/\" target=\"_blank\" rel=\"noreferrer noopener\">Hydrographic Confederation <\/a>\n  <a href=\"https:\/\/www.chebro.es\/\">Confederaci\u00f3n Hidrogr\u00e1fica del Ebro<\/a>\n<\/strong>in collaboration with the other administrations that form part of the Strategy, the Governments of <strong>La Rioja, Navarre and Aragon<\/strong>.<\/p>\n\n<p>It should be noted that, prior to the drafting of the construction projects, the corresponding days of public exhibition and participation of the population will be held in those sections where they have not yet been carried out.<\/p>\n\n<p><strong>Strategy Progress<\/strong><\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Strategy Progress<\/strong><\/h3>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"724\" src=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2022\/05\/2_FIGURA_TRAMOS_alta_res-1024x724.jpg\" alt=\"Map with the Ebro Resilience Strategy study sections\" class=\"wp-image-4483\" srcset=\"https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2022\/05\/2_FIGURA_TRAMOS_alta_res-1024x724.jpg 1024w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2022\/05\/2_FIGURA_TRAMOS_alta_res-300x212.jpg 300w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2022\/05\/2_FIGURA_TRAMOS_alta_res-768x543.jpg 768w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2022\/05\/2_FIGURA_TRAMOS_alta_res-1536x1086.jpg 1536w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2022\/05\/2_FIGURA_TRAMOS_alta_res-2048x1448.jpg 2048w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2022\/05\/2_FIGURA_TRAMOS_alta_res-206x146.jpg 206w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2022\/05\/2_FIGURA_TRAMOS_alta_res-50x35.jpg 50w, https:\/\/www.ebroresilience.com\/wp-content\/uploads\/2022\/05\/2_FIGURA_TRAMOS_alta_res-106x75.jpg 106w\" sizes=\"(max-width:767px) 480px, (max-width:1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Ebro Resilience Strategy Study Tranches<\/figcaption><\/figure><\/div>\n<p>With this tender, <strong>17 of the 19 sections of the Ebro Resilience Strategy will be put into operation<\/strong>. For this purpose, it should be recalled that sections 0 Ebro at Milagro and Alfaro; 12A Ebro at Osera de Ebro and Fuentes de Ebro and 13 Ebro between Castej\u00f3n and Tudela, are in  <strong>different phases of execution<\/strong> at this moment by the  <strong><a href=\"https:\/\/web.larioja.org\/\" target=\"_blank\" rel=\"noreferrer noopener\">Government of La Rioja,<\/a> the Ebro River Basin Authority and the <a href=\"https:\/\/www.navarra.es\/es\/inicio\" target=\"_blank\" rel=\"noreferrer noopener\">Government of Navarra<\/a> <\/strong>through its public company  <strong><a href=\"https:\/\/www.gan-nik.es\/es\" target=\"_blank\" rel=\"noreferrer noopener\">GAN-NIK.<\/a><\/strong><\/p>\n\n<p>Sections 7 Ebro in Alcal\u00e1 de Ebro and Remolinos; 9 Ebro in Torres de Berrell\u00e9n and Sobradiel and 14 Ebro in El Burgo de Ebro, are at the <strong>project drafting<\/strong> stage. 7 and 9 by the <strong>\n  <a href=\"https:\/\/www.aragon.es\/\" target=\"_blank\" rel=\"noreferrer noopener\">Government of Aragon<\/a>\n<\/strong> and on the 14th by the <strong>Confederaci\u00f3n Hidrogr\u00e1fica del Ebro<\/strong>.<\/p>\n\n<p><strong>More information<\/strong><\/p>\n\n<p><a href=\"https:\/\/contrataciondelestado.es\/wps\/portal\/!ut\/p\/b0\/04_Sj9CPykssy0xPLMnMz0vMAfIjU1JTC3Iy87KtUlJLEnNyUuNzMpMzSxKTgQr0w_Wj9KMyU1zLcvQjEz28_XPMjTz8i108LRJ9jAOCgg0NAm1t9Qtycx0BjofB8w!!\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Public Sector Procurement Platform<\/strong><\/a><\/p>\n\n<p><strong>File:<\/strong> TSA0076891<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ebro Resilience Strategy launches the bidding process for four consulting contracts for the drafting of the construction projects of sections 3A, 3B, 4, 5, 6, 8, 10, 11, 12B, 15 and 16. The Ebro Resilience Strategy is developing a<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":16,"featured_media":8007,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ngg_post_thumbnail":0,"footnotes":""},"categories":[369],"tags":[523,521,388,387,378,522,398,524,395,435,520],"class_list":["post-10542","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-bidding","tag-channel","tag-che-en","tag-ebro-en","tag-ebro-resilience-en","tag-ebro-river","tag-flood","tag-morphological-recovery","tag-participation","tag-river-restoration","tag-sections"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-05-07 14:11:16","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts\/10542","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/comments?post=10542"}],"version-history":[{"count":2,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts\/10542\/revisions"}],"predecessor-version":[{"id":10544,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/posts\/10542\/revisions\/10544"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/media\/8007"}],"wp:attachment":[{"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/media?parent=10542"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/categories?post=10542"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ebroresilience.com\/en\/wp-json\/wp\/v2\/tags?post=10542"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}